A condominium unit is often the biggest purchase a family will ever make. So it is a particular kind of disappointment when, after years of payments, the unit is finally turned over and it is not livable: water seeps through the walls and ceiling, cracks run across the floor, the plumbing backs up, outlets do not work, or mold starts growing within weeks.
In several of the HSAC cases I have handled, the defects went well beyond a punch list. They were so serious that the buyer could not use the unit for the very purpose it was bought: as a home or as a rental. In those cases, the law allows the buyer to do more than ask for repairs. The buyer may rescind the contract and recover what was paid. This guide explains when that remedy is available and how to protect yourself from the day of turnover.
Not every defect justifies rescission
Rescission is a serious remedy, and the courts reserve it for serious breaches. Under Article 1191 of the Civil Code, the injured party in a reciprocal obligation may choose between demanding performance and rescinding the contract, with damages in either case. But the Supreme Court has long held that rescission will not be allowed for a slight or casual breach, only for a breach so substantial and fundamental that it defeats the very object of the parties in making the agreement (Song Fo & Co. v. Hawaiian-Philippine Co.).
In practice, I sort defects into two groups:
Swipe the table sideways to see both columns →
| Usually repair or damages only | May justify rescission | |
|---|---|---|
| Examples | Paint touch-ups, minor tile or cabinet defects, a loose fixture, a misaligned door | Persistent leaks and seepage, structural cracks, defective plumbing or sewage, no working water or power, unhealthy mold, a unit materially different from the plans or advertisements |
| Effect on the buyer | An inconvenience; the unit remains usable | The unit is unsafe, unhealthy or unlivable; the purpose of the purchase is defeated |
| Typical remedy | Punch-list repairs, price adjustment, damages | Rescission, refund of all payments with interest, and damages |
A defect that the developer cannot or will not fix after repeated demands can move from the first column to the second. A record of failed repairs is often what turns a defect into a substantial breach.
The legal bases buyers can invoke
- Rescission for substantial breach (Civil Code, Art. 1191). The developer’s core obligation is to deliver a unit fit for use as a dwelling, built as promised. A unit that cannot be lived in is a failure of that obligation.
- Warranty against hidden defects (Civil Code, Arts. 1561 and 1567). The seller is responsible for hidden defects that render the property unfit for its intended use or so diminish its fitness that the buyer would not have bought it, or would have paid less. The buyer may withdraw from the contract or ask for a proportionate reduction of the price. Caution: this action must be brought within six months from delivery (Art. 1571), which is why it is rarely the only basis we rely on.
- P.D. 957, the Subdivision and Condominium Buyers’ Protective Decree. A developer must build according to its approved plans and is bound by what it advertised (Sec. 19). When the developer fails to develop the project according to the approved plans, the buyer may stop paying after due notice and recover the total amount paid, including amortization interest but excluding delinquency interest, with legal interest (Sec. 23).
- Damages. Actual damages, such as rent paid elsewhere while the unit is unlivable or the cost of an engineer’s inspection, and moral and exemplary damages and attorney’s fees where the developer acted in bad faith.
Was your condo turned over with serious defects? Bring your contract, turnover documents and photos. We will assess whether you can rescind.
What I tell clients to do at turnover
Many defect cases are won or weakened on the day of turnover. Developers routinely rely on a signed acceptance form to argue that the unit was delivered in good condition.
- Inspect thoroughly before signing anything. Bring a checklist, and if possible a contractor or engineer. Run every faucet, flush every toilet, test every outlet and switch, check the ceiling and walls near windows and pipes, and look for cracks.
- Document everything. Take date-stamped photos and videos of every defect.
- Do not sign a clean acceptance. List the defects on the turnover form itself, or sign only “subject to the attached punch list” with an express reservation of your rights.
- Get the punch list acknowledged in writing, with a committed completion date for repairs.
- Keep every communication with the developer and the property management office in writing.
When repairs fail or the unit is unlivable: building the case
- Make written demands for repair with a reasonable deadline, and document each failed or incomplete repair.
- Get an independent assessment. A report from a licensed engineer or architect describing the defects, their cause and whether the unit is fit for habitation carries great weight before the HSAC.
- Check the project’s permits. Confirm whether the building has its certificate of occupancy and whether the unit was built according to the approved plans and specifications.
- Send a notice of rescission and demand for refund once the defects are clearly substantial. If you are still paying, give written notice before suspending payments under Section 23 of P.D. 957.
- File with the HSAC for rescission and refund of all payments with interest, or alternatively for repair or price reduction, plus damages. See our guides on how to file a case before the HSAC and 10 practical tips for an HSAC complaint.
Mistakes that weaken a defect case
- Signing a clean acceptance form without noting the defects.
- Doing your own major repairs before the defects are documented and the developer is given a chance to fix them. This can destroy the evidence and weaken the claim of substantial breach.
- Relying only on verbal complaints to the property management office.
- Missing the six-month window for a hidden-defects claim when it is your strongest basis.
- Stopping payments without written notice, which gives the developer grounds to cancel for default.
- Accepting a “transfer” to another unit without reading the waiver in the transfer documents. See our guide on late turnover and downgraded units.
Defects in common areas, such as the roof, the façade, elevators and shared plumbing, are often the concern of all unit owners and the condominium corporation. Where many units are affected, a coordinated or group complaint is usually stronger.
How we can help
ZZ Law Office and Associates represents condominium and subdivision buyers against developers for defective units: documenting defects, sending demands for repair and notices of rescission, coordinating independent engineering assessments, and filing complaints before the HSAC for rescission and refund, repair and damages, including group complaints by several unit owners. Contact us and bring your contract to sell, receipts, turnover documents, photos and any correspondence with the developer.
Note: Whether defects are serious enough to justify rescission depends on the specific facts, the contract and the evidence. Have your situation assessed before sending a notice of rescission or stopping payments.
Sources
- P.D. No. 957, Subdivision and Condominium Buyers’ Protective Decree (Lawphil)
- Civil Code of the Philippines, R.A. No. 386 (Lawphil)
Frequently asked questions
Can I cancel my condo purchase because the unit is defective?
Yes, if the defects amount to a substantial breach of the developer's obligations. Under Article 1191 of the Civil Code, rescission is allowed for a breach so substantial and fundamental that it defeats the very purpose of the contract, such as a unit that is unsafe or unlivable. Minor or easily repaired defects usually justify only repair or damages, not rescission.
What defects are serious enough for rescission?
It depends on the facts, but examples include persistent water leaks and seepage, structural cracks, defective plumbing or sewage, lack of functioning water or electrical connections, mold that makes the unit unhealthy, a unit materially different from the approved plans or the one advertised, and safety defects. The question is whether the defects defeat the purpose of buying the unit.
Should I sign the turnover or acceptance form if the unit has defects?
Not without noting the defects. Developers often treat a signed acceptance form as proof that the unit was delivered in good condition. Inspect thoroughly, list every defect in writing, and sign only with an express reservation, or ask for a punch list and re-inspection before accepting.
Is there a deadline for complaining about hidden defects?
Yes. An action based on the seller's warranty against hidden defects under the Civil Code prescribes in six months from delivery. Claims based on breach of contract or P.D. 957 generally have longer periods, but you should act promptly in any case.
Where do I file a complaint against the developer for a defective unit?
With the Human Settlements Adjudication Commission (HSAC), which hears complaints by condominium and subdivision buyers against developers, including claims for rescission and refund, repair or specific performance, and damages.
Can I stop paying amortizations because the unit is defective?
Under Section 23 of P.D. 957, a buyer may desist from further payment, after due notice to the developer, when the developer fails to develop the project according to the approved plans. Do not simply stop paying without written notice, because the developer may treat it as a default.